welcome,guest

Wind and Solar Hybrid Street Lamps, Easy Installation

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-25 19:08

  • Browse the number:

    138

Send an inquiries

Company Profile

Xiamen Solar First Energy Technology Co. Ltd

By certification [File Integrity]

Contact: solarfirst(Mr.)  

Telephone:

Area: Beijing

Address: Beijing

Website: http://solarfirst.dghuadun.com/

New Products
Product details
Model Number: SF-SHT-58W Brand Name: SolarFirst. Key Specifications/Special Features: Environment-friendly, energy-savingEasy installation, long lifespanFree-maintenanceLow-voltage, safe and reliableSolar wind hybrid lighting system is an off-grid outdoor lighting system
  • Combined with the LED technology
  • It is an innovative, an independent outdoor lighting system that is cost effective and simple to install almost anywhere
  • Installation point: install the product in place with good sunshine and wind condition to display the function of the product
  • Product characteristics:
    • Working time: 12 hours per day, can last 3 days under bad weather conditions
    • Mode of switch: optical control and time control
    • Working temperatures: -30 to 60°C
    • Wind-proof: 136ks/hour
  • Specifications:
    • Wind and solar controller with lamp controller 400W 24V control charging and guarantee battery and wind generator
    • Battery bank 200Ah 12V lead-acid or gel batteries and maintenance-free
  • Post and accessories:
    • H: 12m
    • Lamp height: 10m
    • Including post accessories, anchor, solar bracket and wire
  • Remarks:
    • This design is based on the condition of 2m/s annual average wind speed, class or above solar energy resource available areas
    • Lighting time: 10 hours per day
    • Guarantee: 3 days without sun and wind
    • Post height: 12m
    • Lamp height: 10m
  • Shipping Information:
    • FOB Port: Xiamen
    • Lead Time: 10 - 12 days
    Main Export Markets:
    • North America
    • Western Europe
    • Asia
    • Australasia
    • Eastern Europe
    • Mid East/Africa