welcome,guest

Double girder lifts workshop gantry crane

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-18 07:49

  • Browse the number:

    118

Send an inquiries

Company Profile

Jiaxing Layo Imp. & Exp. Group Co. Ltd - No. 10 Branch

By certification [File Integrity]

Contact: hy-cranes(Mr.)  

Telephone:

Area: Beijing

Address: Beijing

Website: http://hy-cranes.dghuadun.com/

New Products
Product details
Model Number: MG Type Brand Name: HY Key Specifications/Special Features: 1. Quick detailsFeature: Gantry craneCondition: newApplication: construction site, factory, mining, port, yardRated loading capacity: 5-100tonRated lifting moment: 50-1000KN max.Lifting load: 100 tonMax. lifting height: 30mSpan: 10-50mPlace of origin: Henan, China (Mainland)
Brand name: HY
Model number: MG
Certification: ISO9001 OHSAS BV
Warranty: 2 years
After-sales service provided: engineers available to service machinery overseas
Weight overload protection device: included
Main lifting height: 10m, 11m, 12m
Standard span: 18m, 22m, 26m, 30m, 35m
Working duty: A5-A6
Industry voltage: 220V, 380V, 415V, 440V, 480V
Painting colour: as your requirement
Protect grade: IP55 is avaliable

2.Product description
MG model double beam gantry crane are made up of bridge, trolley, crane traveling mechanism and electric system. All the procedures are finished in the operating room. Applies to the open warehouse or rail along for general handling and lifting work. Also can equipped with many lifting device for special work. Prohibited for lifting high temperature solution, flammable, explosive, corrosion, overloading, dust and other dangerous operations.

3.Customize service
1,Supplying design drawing for freely.
2,We could make door to door service. (custom clearance and transport in overseas)
3,Providing guide installation and commissioning.
4,Maintained for two years. (Detail maintained plan).

4.Packing & delivery
Packaging details: electric parts in wooden case other in export plastic cloth
Delivery detail: shipped in 35 days after payment
Shipping Information:
  • FOB Port: Tianjing, Shanghai Port
  • Lead Time: 35 - 45 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America